Aftercare & Drying

Aftercare & Drying

 

Aftercare

After the pour we suggest the recommendations on our Aftercare sheet should be followed.

Drying

Truflow Screed dries naturally at a rate of 1 day per millimetre thickness, at an outside temperature of 20ºC. However this can be greatly affected by the actual temperature conditions at the time.

If there are underfloor heating circuits in the screed, these can be turned on to a low temperature seven days after the screed is poured, starting at 15 ºC and increasing by 5 ºC per day. This will help reduce the drying out time.

It is absolutely essential to ensure that the floor screed is fully dried out before ANY floor finish is installed.

Unlike cement based screeds, Truflow Screed does not retain moisture. When it reaches 0% moisture levels, you can be guaranteed there will be no more difficulties with moisture content in the floor. Cement based floor screeds have a tendency to release trapped water 6-12 months after a floor has been laid. There are known examples of timber floors, particularly wide plank, which have curled and distorted 6-12 months after installation over cementitous screeds. This type of phenomenon does not occur with Truflow Screed. When the screed has dried to zero moisture, you can be guaranteed it has fully released any moisture content. Flooring contractors can be virtually guaranteed zero problems when they apply floor finishes over an Truflow Screed floor.

Questions! Call:

07710 468 654

020 8463 9880

Photo Gallery

Click here for
Truflow Screed Photo gallery


Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/silvanaship.com/public_html/wp-includes/class-wp-comment-query.php on line 399